The proposed South Tarawa Renewable Energy Project will install solar photovoltaic and battery energy storage system to help the government achieve its renewable energy target for South Tarawa, reduce consumption of diesel fuel for power generation, and help mitigate climate change by avoiding greenhouse gas emissions through clean renewable energy.
Does South Tarawa need solar power?
Constrained renewable energy development and lack of private sector participation. While grid-connected solar power is the least-cost renewable energy option for South Tarawa and there is significant resource potential of 554 MW, deployment has been limited.
How much power does South Tarawa need?
The photovoltaic systems account for 22% of installed capacity but supply only around 9% of demand on South Tarawa; diesel generation supplies the remaining 91%. The PUB serves more than 57,000 people in South Tarawa, which has the highest demand at 24.7 gigawatt-hours (GWh) in 2019.
Who generates grid-connected electricity in South Tarawa?
Grid-connected electricity in South Tarawa is generated and distributed by the state-owned Public Utilities Board (PUB).